    2012 / 2013

Expansion of SCADA application SDNiU of substations in ED Zenica - PJD Travnik. The project involves deployment of the Middle Voltage network owned by Elektroprijenos BiH and switching stations to the existing SCADA system in ED Zenica - PJD Travnik .

Equipment delivery, installation and commissioning of digital radio link systems and project documentation for JP Elektroprivrede BiH.

Delivery and installation of power line disconnectors with motor drive and control management cabinet, communications and telemetry equipment, commissioning and deployment of remote management and control system of line disconnectors from DCU ED Tuzla and development of project documentation for JP EPBiH - ED Tuzla.

Installation of digital radio modems for SDNiU TS 35/10 kV in ED Mostar - PJD Konjic and ED Zenica - PJD Visoko.

Expansion of the existing radio network in the purpose of expansion of SDNiU ULR and TS in accordance to IED 60870-101 communication protocol for the ED Tuzla, ED Zenica - PJ Travnik and ED Mostar.

Delivery and installation of a power line disconnectors with motor drive and control management cabinet, communications and telemetry equipment, fault indicators and commissioning of remote management and control system and failure indicators from DCU ED Tuzla and development of project documentation of the implemented state for JP EPBiH - ED Tuzla.

Installation and commissioning of digital radio links for the mobile provider m:tel with the aim to expand capacity and modernize radio transmission systems. The project includes implementation of a total of 20 paths with a transfer capacity of 150 Mbit / s.